Mechy Try it free

150 hp diesel-driven dewatering pump

Dewatering pump drive coupler

A rock jam shears the engine-to-pump coupler. Replace it and check the pump and drive for damage.

  • 4 h
  • Hard
  • 8 steps
  • 10 tools
Flexible drive coupler and pump shaft on a 150 hp diesel-driven dewatering pump

The whole job 8 steps

Made by AI. A mechanic hasn't checked it line by line yet. Use it to plan the job, and follow the maker's manual for specs and procedures.

Safety first

Shop or dealer job

Do these before step 1.

  • DANGERLockout: engine off, key out, battery isolated; tag controls.
  • DANGERSupport: chock skid; crib pump on rated supports before separation.
  • WARNINGWater: isolate, vent and drain; restrain hoses before disconnecting.

Stop and call a pro or the dealer if

  • Stop and call the dealer for bent shafts, cracked housings or damaged drive pilots.

Mechy's guides help, but they don't replace the maker's manual, your training or your site's rules. If something doesn't match what you see, stop and check.

Tools

Tick what you have. In the app, Mechy ticks the ones it can see in your photos.

Parts and supplies

  • 1×Rubber flexible drive couplerMatch OEM drive interface, power, speed and torsional requirementsCheck before you buy
  • 1×Coupler hardware kitOEM-specified fasteners and locking hardware as requiredCheck before you buy

Steps

  1. Step 1 of 8

    Isolate and support

    Key out, isolate battery, tag controls; chock skid, crib pump, isolate and drain water.

    Lockout kit, Chocks and rated cribbing, Drain pan

  2. Step 2 of 8

    Expose the drive

    Remove guard fasteners and guard after verifying the drive cannot start.

    Socket and wrench set

  3. Step 3 of 8

    Separate the pump

    Support pump; disconnect drained piping, remove mounts and withdraw straight.

    Keep hands out of the separation gap; never suspend the pump by its shaft.

    Rated hoist and slings, Socket and wrench set, Chocks and rated cribbing

  4. Step 4 of 8

    Find collateral damage

    Clear the rock; inspect impeller, hubs and bearings; measure shaft runout.

    Runout and bearing play: Check OEM manual for limits and measurement procedure Check it against your manual.

    Inspection light, Dial indicator kit

  5. Step 5 of 8

    Fit matched coupler

    Remove broken rubber and debris; fit the matched coupler and specified hardware.

    Coupler fastening: Check OEM manual and coupler label for torque and locking Check it against your manual.

    Socket and wrench set, Torque wrench

  6. Step 6 of 8

    Align and engage

    Gauge alignment; slide pump home, tapping only mounting feet gently if needed.

    Never hammer the shaft or draw an unseated drive together with bolts.

    Drive alignment and engagement: Check OEM manual for pilot seating, engagement and Check it against your manual.

    Rated hoist and slings, Alignment gauges, Soft-faced hammer

  7. Step 7 of 8

    Secure and guard

    Torque mounts, recheck alignment, reconnect supported piping and refit the guard.

    Mount and guard fasteners: Check OEM manual for torque, sequence and locking Check it against your manual.

    Torque wrench, Alignment gauges, Socket and wrench set

  8. Step 8 of 8

    Prime and test

    Prime per OEM; clear crew, release lockout and test guarded for flow and vibration.

    Stop for leaks, heat or vibration; re-isolate before any adjustment.

Stuck on this one? Snap your machine and ask Mechy. It redraws these steps for what you have in front of you. First guide free. No sign-up, no card.

Snap a photo, ask Mechy

Or open this job in Mechy and follow it in 3D.

First guide free. No sign-up, no card.

Snap a photo, ask Mechy