Mechy Try it free

Teams

Work Instructions Template

In short

A work instructions format that works has seven parts: a header (title, ID, revision, owner, approver), scope, safety and lockout, tools and parts, numbered steps with a photo or drawing each, checks, and a sign-off. Copy the template below, write one task per document, and test it with someone new to the job.

The template

Copy these fields into your document or form tool.

SectionWhat to write
TitleVerb, object, machine: "Replace the fuel filter: 3 to 4 t mini excavator."
ID and revisionA document number, the revision number and the revision date, on every page.
Owner and approverWho wrote it, who approved it, and the date each signed.
Applies toThe machine types, models or serial ranges, and the site if it matters.
PurposeOne sentence on why the task is done.
ScopeWhere the task starts and ends, and what it doesn't cover.
Who can do itTraining or sign-off needed.
SafetyPPE, the main hazards, and the warnings, in bold.
LockoutThe specific steps to shut down, isolate, block and secure the machine, place the locks, and test that it's dead.
Stop and call ifConditions where the worker stops and calls a lead, mechanic or dealer.
ToolsEach tool with its size.
Parts and materialsPart numbers, quantities, fluids and specs, taken from the manual.
StepsNumbered steps (format below).
ChecksHow to tell the job is done right: what to test, measure or look for.
RecordsWhat gets written down, and where.
ReferencesThe manual section, related SOPs and other work instructions.
Revision historyDate, revision, what changed and who approved it.

Write each step in this format:

#StepKey pointsWhyPicture
1Start with a verb. One action.What makes it go right: position, feel, a check.The reason for each key point.A photo or drawing for this step.

The key points and reasons come from the Job Instruction method of the 1940s Training Within Industry program. Its instructors broke each job into steps and taught the key points and the reasons for them.

Sample work instructions

A filled-in example for a common heavy-equipment task. Locations, grease type and intervals come from your machine's manual, not from this page.

  • Title: Grease the lift-arm pivots: skid steer
  • ID and revision: WI-LDR-014, rev 2
  • Applies to: all skid steers and compact track loaders on site
  • Purpose: keep the pins and bushings from wearing out.
  • Safety: never reach under raised lift arms unless the lift-arm support device is engaged.
  • Tools: grease gun loaded with the grease the manual specifies, rags.
#StepKey pointsWhy
1Park on level ground, lower the bucket flat, set the parking brake and stop the engine.Take the key.No one can move the arms while you're beside them.
2If the manual says to grease with the arms up, raise them and engage the lift-arm support device.Get in and out of the seat the safe way, with three points of contact.Raised arms can come down without warning.
3Find every fitting on the manual's lube chart.Count them, so none get missed.A missed fitting means a dry pin.
4Wipe each fitting clean.Look for cracked or missing fittings.Dirt pumped in with the grease wears the pin.
5Pump in grease as the manual says.Watch the joint, not the gun. If grease leaks at the fitting instead, the fitting may be blocked.Grease that doesn't reach the pin does nothing.
6Wipe off the excess, lower the arms and record the job.Note any fitting that wouldn't take grease.The next shift knows what to fix.

Checks: every fitting on the chart took grease; damaged fittings tagged for replacement. Not sure what thread a replacement fitting needs? See our grease zerk thread size guide.

Rules for writing the steps

  • One action per step, starting with a verb: "Loosen," "Lift," "Measure."
  • Active voice, present tense. The "you" is implied. That's EPA's style rule for SOPs, and it works for work instructions too.
  • Warnings come before the step they apply to, not after it.
  • Numbers come from the manual, with units: torque, pressure, clearances, fluid types.
  • A picture per step wherever position or direction matters.
  • Test it. Give it to someone who hasn't done the job and watch. Every place they hesitate needs a better step or a picture.

Review and control

  • Have the work instruction reviewed by someone with the right training and experience, then signed off.
  • Put the revision number and date on every page so people can tell which version they have.
  • Review it on a schedule (EPA suggests every 1 to 2 years for SOPs) and whenever the machine or method changes.
  • Withdraw old versions so they can't be used.
  • Keep the current copy where the work is done.

Not sure whether you need a work instruction or an SOP? Read work instructions vs SOP. For daily checks, use our heavy equipment inspection checklist. Moving off a headset system? See the Dynamics 365 Guides alternative.

If writing them by hand is the bottleneck, Mechy makes visual work instructions from a phone photo: a tech snaps the machine and says the job, and your senior tech approves the steps before the crew sees them. OEMs and dealers can publish theirs as white-label repair guides.

Questions

What is the format of a work instruction?

A header (title, ID, revision, owner, approver, what it applies to), the purpose and scope, safety and lockout, tools and parts, numbered steps with key points and a picture each, the checks that prove the job is done right, and a revision history.

How do you write work instructions?

Watch someone good do the task and write down every step. Start each step with a verb, one action per step, in the present tense. Add the key point and the reason for each step, and a photo or drawing. Then have someone new follow it while you watch, and fix every place they hesitate.

Should work instructions have pictures?

Yes, for any step where position, direction or a part's look matters. EPA's SOP guidance recommends diagrams and flow charts to break up long text. A photo or drawing per step is the easiest way to show which bolt, which way and how far.

Who should approve a work instruction?

Someone who knows the task well and wasn't the author, plus whoever owns the process. EPA's SOP guidance has documents reviewed by people with the right training and experience, then signed off, with the approval date on the document.

Sources

  1. Guidance for Preparing Standard Operating Procedures (SOPs), EPA QA/G-6 (EPA/600/B-07/001, April 2007)
  2. Training Within Industry (Job Instruction: key points and reasons), Wikipedia
  3. 29 CFR 1910.147, The control of hazardous energy (lockout/tagout), OSHA
  4. NIOSH Alert: Preventing Injuries and Deaths from Skid-Steer Loaders (lift-arm support device), DHHS NIOSH Publication 2011-128

Updated · By Mechy (Winding AI, Inc.) · How we write these pages

Try it on your own machines

A 3-month pilot: your techs snap the jobs, your senior tech approves the steps, the crew follows them on their phones.

No headsets, no CAD files.