Small mine wash plant
Hopper load-relief beam
The hopper keeps bridging, then dumps too much weight straight onto the feed belt.
- 10 h
- Expert
- 8 steps
- 9 tools

Made by AI. A mechanic hasn't checked it line by line yet. Use it to plan the job, and follow the maker's manual for specs and procedures.
Safety first
Shop or dealer jobDo these before step 1.
- DANGERLock out: implements down, chocked, key out, isolator off, tag on.
- DANGERBlocking: crib the hopper and chock anything that can move.
- WARNINGLifting: keep everyone outside the suspended-load zone.
Stop and call a pro or the dealer if
- Stop for cracked, thinned or distorted structure; call the OEM or a structural engineer.
Mechy's guides help, but they don't replace the maker's manual, your training or your site's rules. If something doesn't match what you see, stop and check.
Tools
Tick what you have. In the app, Mechy ticks the ones it can see in your photos.
Parts and supplies
- 1×Square structural tubingEngineer-approved grade, section and length; check OEM documentation andCheck before you buy
- 4×Support postsEngineered sections carrying load into verified structural frameCheck before you buy
- 2×Support crossheadsEngineered sections spanning outside belt travelCheck before you buy
- 4×Connection platesEngineer-approved bearing and attachment platesCheck before you buy
- 1×Welding consumablesMatch verified base metals and approved welding procedureCheck before you buy
Steps
Step 1 of 8
Isolate and block
Lower attachments; engine off, key out, isolator off; tag, chock, crib and prove dead.
Lock out remote feeders too; release belt tension and stored pressure safely.
Lockout kit, Rated cribbing and chocks
Step 2 of 8
Empty and assess
Clean from outside; inspect hopper, belt and frame before approving a load-path design.
No entry beneath bridged material; use a site-approved entry plan if needed.
Material cleanout equipment, Measuring and marking tools
Step 3 of 8
Prepare the steel
Verify steel grade; cut, bevel and clean joints to the approved welding procedure.
Model geometry is illustrative; obtain OEM or engineer-approved fabrication sizes.
Angle grinder, Measuring and marking tools
Step 4 of 8
Lower relief tube
Rig the tube lengthways; lower onto rated temporary supports and check flow clearance.
No hands below the load; never use the belt as a landing surface.
Crane and rated rigging, Rated cribbing and chocks
Step 5 of 8
Fit structural supports
Fit posts, bearing plates and crossheads to transfer load into the approved frame.
Keep temporary support until the completed structure is accepted.
Welder, Measuring and marking tools
Step 6 of 8
Complete specified welds
Make specified root passes and fillets in sequence; inspect before releasing supports.
Shield or remove belt near hot work; put the weld return close to the joint.
Welder, Weld inspection kit, Fire protection and screens
Step 7 of 8
Check running clearance
Inspect welds, belt travel and skirt fit; clear debris and reinstall all guards.
Check belt tension and clearance against OEM limits before removing lockout.
Measuring and marking tools, Weld inspection kit
Step 8 of 8
Controlled feed trial
Clear personnel, release lockout by procedure, then trial empty and gradually add feed.
Observe from guarded positions; stop and re-isolate before any adjustment.