Mechy Try it

Spiral concentrator

Spiral concentrator pipe relining

The aged rubber liner in an old spiral concentrator folds inward and plugs its pipe, and the flow stops.

  • 8 h
  • Hard
  • 8 steps
  • 10 tools
Internal rubber-lined pipe on a spiral concentrator

The whole job 8 steps

Made by AI. A mechanic hasn't checked it line by line yet. Use it to plan the job, and follow the maker's manual for specs and procedures.

Safety first

Shop or dealer job

Do these before step 1.

  • DANGERIsolation: lock out the wash plant and isolate all incoming flow.
  • DANGERSupport: chock equipment and crib the pipe before releasing joints.
  • WARNINGRubber: no torch burning; use a qualified lining shop.

Stop and call a pro or the dealer if

  • Stop and call a qualified lining shop or engineer for cracks, thin walls or distorted flanges.

Mechy's guides help, but they don't replace the maker's manual, your training or your site's rules. If something doesn't match what you see, stop and check.

Tools

Tick what you have. In the app, Mechy ticks the ones it can see in your photos.

Parts and supplies

  • 1×Shop-bonded rubber liningLining shop to match slurry duty, bore, bonding system and cureCheck before you buy
  • 1×Flange gasket setMatch surveyed joints and lining manufacturer's requirementsCheck before you buy
  • 1×Flange fastener setMatch verified flange standard; replace damaged hardwareCheck before you buy

Steps

  1. Step 1 of 8

    Lock out and support

    Stop plant; key out, isolators off, tag controls; chock and crib movable equipment.

    Prove zero energy; isolate gravity feed and relieve trapped pressure.

    Lockout kit, Rated pipe stands and chocks

  2. Step 2 of 8

    Drain and remove spool

    Prove drained through a safe drain; support, disconnect and lift the spool clear.

    A blockage can trap slurry; never loosen a flange to prove zero pressure.

    Drain pan, Rated pipe stands and chocks, Socket set, Rated lifting sling and hoist

  3. Step 3 of 8

    Cold-strip failed rubber

    Have the lining shop cold-strip all failed rubber and collect the debris.

    No torch or external hammering; fumes and shell damage are avoidable.

    Cold liner stripping tools

  4. Step 4 of 8

    Assess bare shell

    Clean and inspect the bore, flanges and wall thickness before approving reuse.

    Reject cracks, severe pitting or distortion pending engineered assessment.

    Borescope, Ultrasonic thickness gauge

  5. Step 5 of 8

    Shop reline and cure

    Shop-bond new rubber; complete cure and specified adhesion and continuity checks.

    Release only with documented cure and inspection acceptance.

    Lining acceptance: Verify material, thickness, cure and test limits with the Check it against your manual.

    Lining inspection equipment

  6. Step 6 of 8

    Refit lined spool

    Fit new approved gaskets and align the supported spool without forcing the flanges.

    Do not pull misaligned piping together with bolts.

    Rated lifting sling and hoist, Socket set

  7. Step 7 of 8

    Tighten flange joints

    Cross-tighten in stages to the verified joint specification.

    Flange tightening: Check OEM or gasket/lining supplier torque for the actual Check it against your manual.

    Torque wrench

  8. Step 8 of 8

    Prove flow safely

    Clear tools, restore guards, release lockout by procedure and run a controlled water test.

    Observe externally while running; isolate and drain before any internal inspection.

    Borescope

Stuck on this one? Snap your machine and ask Mechy. It redraws these steps for what you have in front of you.

Snap a photo, ask Mechy

Or open this job in Mechy and follow it in 3D.

Snap a photo, ask Mechy