Mechy Try it free

Wash plant

Wash plant feeder shaft repair

The head pulley input shaft snaps and leaves a piece in the gearbox, so the feeder has no drive.

  • 16 h
  • Expert
  • 8 steps
  • 11 tools
Feeder head pulley input shaft on a wash plant

The whole job 8 steps

Made by AI. A mechanic hasn't checked it line by line yet. Use it to plan the job, and follow the maker's manual for specs and procedures.

Safety first

Shop or dealer job

Do these before step 1.

  • DANGERLock out: implements down, chocked, key out, isolator off, tag on.
  • DANGERSupport it: level ground, rated stands or cribbing, not a jack.
  • WARNINGHeavy part (23 kg+): lifting gear or two people, mind pinch points.

Stop and call a pro or the dealer if

  • Call the dealer or a shaft engineer for cracks, distorted hubs or unknown shaft construction.
  • Stop if unseen damage, missing drawings or unsafe lifting prevents a verified repair.

Mechy's guides help, but they don't replace the maker's manual, your training or your site's rules. If something doesn't match what you see, stop and check.

Tools

Tick what you have. In the app, Mechy ticks the ones it can see in your photos.

Parts and supplies

  • 1×Approved pulley shaft or assemblyOEM-approved material, heat treatment, fits and drive interface; noCheck before you buy
  • 1×Bearing and seal setMatch pulley shaft and housings; replace damaged componentsCheck before you buy
  • 1×Drive retention hardwareMatch actual gearbox, sprocket and shaft arrangementCheck before you buy

Steps

  1. Step 1 of 8

    Isolate and restrain

    Lower attachments; isolate all drives, tag controls, chock, crib and restrain belt.

    Verify zero energy; relieve stored pressure before disturbing hydraulic lines.

    Lockout kit, Chocks and rated cribbing, Rated belt restraints

  2. Step 2 of 8

    Open the drive

    Verify dead, empty the feeder and remove the guard before releasing chain tension.

    Socket set

  3. Step 3 of 8

    Support and strip

    Sling gearbox; remove chain, retainers, gearbox and trapped shaft fragment.

    Confirm actual drive layout before pulling; this model is schematic.

    Hoist and rated slings, Socket set, Puller and press

  4. Step 4 of 8

    Find the cause

    Check cracks, fits, bearings, gearbox, alignment and jams before ordering the repair.

    Stop for cracked hubs or unknown shaft attachment; involve dealer or engineer.

    Magnetic particle inspection kit, Micrometers, Dial indicator

  5. Step 5 of 8

    Renew shaft assembly

    Lift out pulley; shop-fit an approved shaft or renew the complete pulley assembly.

    No drilled ready-rod splice or field weld on the broken shaft.

    Hoist and rated slings, Puller and press, Micrometers

  6. Step 6 of 8

    Check pulley geometry

    Seat bearings, secure mounts and verify shaft runout, end float and belt tracking.

    Fits, runout and mounting torque: Check OEM manual or approved repair drawing; do not infer Check it against your manual.

    Dial indicator, Torque wrench, Straightedge

  7. Step 7 of 8

    Rebuild the drive

    Refit gearbox and chain; align sprockets, set tension and torque retainers to OEM.

    Drive setup: Verify chain tension, alignment and fastener torque in OEM Check it against your manual.

    Hoist and rated slings, Straightedge, Torque wrench

  8. Step 8 of 8

    Guard and prove

    Fit guard; clear tools and crew, release LOTO, then test empty before gradual loading.

    Stop for wobble, heat or noise; re-isolate before checking or adjusting.

    Socket set

Stuck on this one? Snap your machine and ask Mechy. It redraws these steps for what you have in front of you. First guide free. No sign-up, no card.

Snap a photo, ask Mechy

Or open this job in Mechy and follow it in 3D.

First guide free. No sign-up, no card.

Snap a photo, ask Mechy