Wash plant
Wash plant pre-wash drive shaft
The spare drive shaft is too long and its keyways do not match, so it needs checked machining before it goes in.
- 8 h
- Expert
- 8 steps
- 12 tools

Made by AI. A mechanic hasn't checked it line by line yet. Use it to plan the job, and follow the maker's manual for specs and procedures.
Safety first
Shop or dealer jobDo these before step 1.
- DANGERLock out: implements down, chocked, key out, isolator off, tag on.
- DANGERSupport it: level ground, rated stands or cribbing, not a jack.
- WARNINGMachining: use a qualified shop; keep sparks away from the belt.
Stop and call a pro or the dealer if
- Call the plant dealer or engineer if shaft material, geometry or keyway strength cannot be verified.
- Stop for cracked supports, damaged hubs or an unexplained fracture; inspect onsite before machining.
Mechy's guides help, but they don't replace the maker's manual, your training or your site's rules. If something doesn't match what you see, stop and check.
Tools
Tick what you have. In the app, Mechy ticks the ones it can see in your photos.
Parts and supplies
- 1×Replacement drive shaftApproved material, shoulders, journals and keyways to verified drawingCheck before you buy
- 2×Bearing unitsMatch shaft fits, load rating, seals and mounting arrangementCheck before you buy
- 2×Shaft keysMatch approved keyways and hub engagementCheck before you buy
- 1×Drive retention hardwareReplace damaged locks and retainers to plant documentationCheck before you buy
Steps
Step 1 of 8
Isolate and restrain
Lower equipment; engine off, key out, isolator off; lock/tag, crib and clamp belt.
Isolate all plant feeds; relieve hydraulic pressure and prove zero energy.
Lockout kit, Rated cribbing and belt clamps
Step 2 of 8
Strip and support
Release belt tension; remove guard and drive, then hoist out the broken shaft.
Support drum independently; release take-up energy under restraint.
Socket set, Puller, Rated hoist and slings
Step 3 of 8
Verify shaft layout
Check reversed orientation against the drawing, journals, hubs and full key engagement.
Model is schematic; establish every dimension from plant records and parts.
Reported excess length: 1.5 ft reported only; check OEM drawing before establishing Check it against your manual.
Precision measuring tools
Step 4 of 8
Machine approved shaft
Saw and face to verified length; mill approved keyways, deburr and check runout.
Do not freehand-grind keyways or weld-fill mismatches; reject unsafe geometry.
Metal-cutting saw, Lathe and milling machine, Precision measuring tools
Step 5 of 8
Fit bearing units
Fit bearings square with approved tooling; transmit fitting force through fitted rings.
Follow bearing instructions for fit, heating and fixed/floating arrangement.
Bearing heater or press, Precision measuring tools
Step 6 of 8
Mount shaft assembly
Hoist shaft into supported drum; fit hub key, align housings and torque mounts.
Mounts and bearing locks: Check OEM manual and bearing label for torque and locking Check it against your manual.
Rated hoist and slings, Alignment straightedge, Torque wrench
Step 7 of 8
Restore chain drive
Fit keyed sprockets and retainers; align chainline and set chain and belt tension.
Drive setup: Check OEM manual for chain slack, belt tension, lubrication Check it against your manual.
Alignment straightedge, Torque wrench, Socket set, Grease gun
Step 8 of 8
Guard and commission
Refit guard; clear crew, release isolation, test unloaded, then inspect under lockout.
Stop for heat, vibration or tracking drift; never adjust a running drive.
Socket set, Lockout kit