Mechy Try it

Shaker-deck wash plant

Wash plant screen motor tensioner repair

The screen-deck motor bounces after its tensioner anchor tears free of the mounting plate.

  • 5 h
  • Expert
  • 8 steps
  • 12 tools
Screen-deck motor tensioner bolt and mounting plate on a shaker-deck wash plant

The whole job 8 steps

Made by AI. A mechanic hasn't checked it line by line yet. Use it to plan the job, and follow the maker's manual for specs and procedures.

Safety first

Shop or dealer job

Do these before step 1.

  • DANGERLock out: implements down, chocked, key out, isolator off, tag on.
  • DANGERSupport it: level ground, rated stands or cribbing, not a jack.
  • WARNINGHeavy part (23 kg+): lifting gear or two people, mind pinch points.
  • WARNINGHot work: permit, combustibles cleared, fire watch and extinguisher.

Stop and call a pro or the dealer if

  • Stop for OEM/dealer review if the plate or supporting frame is cracked, torn or distorted.

Mechy's guides help, but they don't replace the maker's manual, your training or your site's rules. If something doesn't match what you see, stop and check.

Tools

Tick what you have. In the app, Mechy ticks the ones it can see in your photos.

Parts and supplies

  • 1×Approved tensioner anchorOEM-approved weldable anchor; never weld an unidentified boltCheck before you buy Size chart
  • 1×Mounting plateReplace if torn, thinned or cracked; approved material and geometryCheck before you buy
  • 1×Welding consumablesMatch confirmed base metals and approved repair WPSCheck before you buy

Steps

  1. Step 1 of 8

    Lock out plant

    Lower equipment; engine off, key out, battery off; tag controls and prove dead.

    Isolate every feed, motor and deck drive; release stored energy.

    Lockout kit, Voltage tester

  2. Step 2 of 8

    Support the motor

    Hoist at approved lift points; crib motor and restrain deck before releasing tension.

    No suspended-load work; account for belt and isolator preload.

    Rated hoist and slings, Rated cribbing and restraints

  3. Step 3 of 8

    Expose failed anchor

    Remove guard, unload belt, then remove nut, washer and isolator from the anchor.

    Torque wrench and sockets

  4. Step 4 of 8

    Approve repair route

    Inspect tear and cradle; obtain OEM repair details and confirm weldable anchor material.

    No confirmed weldability or sound plate: stop for an approved replacement.

    Crack inspection kit, Straightedge and alignment tools

  5. Step 5 of 8

    Prepare and align

    Permit hot work; prep per WPS, shield rubber and clamp anchor to approved geometry.

    Assign fire watch; clear slurry, oils and hidden combustibles.

    Grinder, Clamps, Straightedge and alignment tools, Fire extinguisher

  6. Step 6 of 8

    Weld approved repair

    Qualified welder follows WPS; return clamp goes on plate beside repair, then inspect.

    Keep welding current out of bearings, motor and electronics.

    Welder, Welding PPE and screens, Crack inspection kit

  7. Step 7 of 8

    Reassemble and set

    Fit sound isolator, washer, nut and belt; align sheaves, set tension and refit guard.

    Fasteners and belt setting: Use OEM torque, isolator preload and belt-tension procedure Check it against your manual.

    Torque wrench and sockets, Straightedge and alignment tools

  8. Step 8 of 8

    Release and prove

    Remove supports safely; clear crew, release lockout and test from outside guards.

    Stop on abnormal motion; maintain permit fire watch after welding.

    Fire extinguisher

Stuck on this one? Snap your machine and ask Mechy. It redraws these steps for what you have in front of you.

Snap a photo, ask Mechy

Or open this job in Mechy and follow it in 3D.

Snap a photo, ask Mechy