Shaker-deck wash plant
Wash plant shaker shaft rebuild
A trapped rock breaks through the shaft guard and tube, and grit and water seize the shaker bearings.
- 16 h
- Expert
- 8 steps
- 14 tools

Made by AI. A mechanic hasn't checked it line by line yet. Use it to plan the job, and follow the maker's manual for specs and procedures.
Safety first
Shop or dealer jobDo these before step 1.
- DANGERLock out: implements down, chocked, key out, isolator off, tag on.
- WARNINGHeavy part (23 kg+): lifting gear or two people, mind pinch points.
- DANGERBlocking: crib deck and chock plant before releasing shaft supports.
- DANGERLifting: use rated rigging; exclude people from suspended-load zones.
Stop and call a pro or the dealer if
- Call the dealer for cracked deck structure, damaged journals or uncertain bearing fits.
Mechy's guides help, but they don't replace the maker's manual, your training or your site's rules. If something doesn't match what you see, stop and check.
Tools
Tick what you have. In the app, Mechy ticks the ones it can see in your photos.
Parts and supplies
- 2×Shaker bearingsMatch actual arrangement, load rating, internal clearance and OEM designationCheck before you buy
- 2×Bearing seal kitsOEM-compatible contamination exclusion and shaft sealingCheck before you buy
- 1×Shaft enclosure tubeOEM-approved replacement; retain bearing alignment and running clearanceCheck before you buy
- 1×Rock guard plateOEM-approved profile and attachment; prevent rock entrapmentCheck before you buy
- 1×Bearing lubricantOEM type, compatibility and fill quantityCheck before you buy
- 1×Bearing retainers and hardwareReplace disturbed locking elements and unserviceable fastenersCheck before you buy
Steps
Step 1 of 8
Isolate and block
Lower attachments; stop, key out, battery off; tag controls, isolate water, crib deck.
Relieve stored pressure and prove the drive cannot start.
Lockout kit, Rated cribbing and chocks
Step 2 of 8
Expose the assembly
Remove guards; release belt tension and remove belts without levering on sheaves.
Wrenches and sockets
Step 3 of 8
Rig and unbolt
Support shaft and housings independently; mark orientation, then remove mounting bolts.
Verify assembly mass, center of gravity and crane capacity before lifting.
Crane and lifting beam, Rated slings and shackles, Wrenches and sockets
Step 4 of 8
Extract rotating assembly
Follow OEM extraction sequence; support both ends and land assembly on rated stands.
Do not force seized bearings or assume this schematic proves clearance.
Crane and lifting beam, Rated slings and shackles, Rated cribbing and chocks
Step 5 of 8
Restore contamination barrier
Clean debris; inspect journals, bores and deck; replace breached tube by approved method.
Stop for cracks, heat damage or uncertain fits; no improvised weld repair.
Fits and runout: Check OEM manual for journal, bore, shaft and housing Check it against your manual.
Cleaning equipment, Micrometers and bore gauges, Dial indicator
Step 6 of 8
Rebuild on bench
Strip housings; fit bearings, seals and locks; lubricate and set OEM clearance.
Apply mounting force only through the fitted race; never through rollers.
Bearing setup: Verify bearing identity, heating limit, fits, clearance and Check it against your manual.
Bearing puller and press, Bearing induction heater, Micrometers and bore gauges, Grease equipment
Step 7 of 8
Refit and align
Refit assembly, align housings and drive; torque mounts, then check free rotation.
Assembly settings: Use OEM fastener torques, shaft end float and housing Check it against your manual.
Crane and lifting beam, Rated slings and shackles, Alignment tools, Torque wrench
Step 8 of 8
Guard and commission
Fit new rock guard, belts and guards; clear area, release LOTO and test unloaded.
Stop for heat, noise or vibration; re-isolate before any adjustment.
Commissioning: Verify OEM belt tension, guard clearance and Check it against your manual.
Wrenches and sockets, Torque wrench, Vibration and temperature meter





