Learn
How to Use an Excavator
In short
To use an excavator, walk around it, climb in with three points of contact, fasten the seat belt and check which control pattern it uses. Call 811 before you dig. Lower the blade if it has one, keep people out of the swing radius, and dig with small, smooth lever moves. Set the lock lever before you get out.
The basics are the same on a mini excavator and a full-size one. This page covers them in general terms. The operator's manual and the decals in your cab are the rule for your machine, so read them and get trained first. OSHA's construction rule lets employers put only workers qualified by training or experience on equipment.
Before you dig
- Call 811. It is free. Call or submit online a few business days before you dig, and wait for the utilities to mark their lines. OSHA requires the location of underground utilities to be worked out before an excavation is opened.
- Look up. OSHA requires equipment to stay at least 10 feet from power lines rated 50 kV or below, and farther from higher voltages. Treat every overhead line as live.
- Walk around the machine. Check for leaks, cracked or loose parts, worn teeth and track damage. Our heavy equipment inspection checklist has the full list.
- Test the attachment. If the bucket sits on a quick coupler, do the connection test the maker specifies before you use it. NIOSH links falling buckets from quick couplers to deaths.
- Plan the hole. Trenches 4 feet or deeper need a ladder, ramp or stairway within 25 feet of travel. Trenches 5 feet or deeper need a protective system (sloping, shoring or a trench box) unless they're in stable rock. Keep spoil at least 2 feet back from the edge.
Keep people out of the swing radius
NIOSH says workers should never be within the swing radius of an operating excavator. That includes the reach of the arm and the back of the house, where the counterweight can pin someone against a truck, wall or tree. No one stands under the bucket or a load. Mark off the swing area, and stop if anyone walks into it.
Get in and set up
- Climb in facing the machine with three points of contact: two hands and a foot, or two feet and a hand.
- Fasten the seat belt and keep it on the whole time you run the machine.
- Adjust the seat and mirrors. Leave the controls locked until you're seated, belted and ready to move.
- Start the engine the way the manual says and check the display for warnings.
Know the controls
An excavator has four digging motions:
- Swing: the whole upper (the house) turns on the undercarriage.
- Boom: the first section of the arm, up and down.
- Stick (also called the arm or dipper): out and in.
- Bucket: curl in and dump out.
Two joysticks run them, and the two common patterns swap the boom and the stick between your hands:
| Pattern | Left joystick | Right joystick |
|---|---|---|
| ISO | Swing (left and right), stick (out and in) | Boom (up and down), bucket (curl and dump) |
| SAE | Swing (left and right), boom (up and down) | Stick (out and in), bucket (curl and dump) |
Some machines can switch between the two. Find the pattern decal in the cab, then move each function slowly with the bucket clear of everything before you dig. Many mini excavators also have a dozer blade and a boom-swing control that offsets the boom left or right. On some machines the boom swing is a pedal.
Travel
Travel levers (or pedals) drive each track. The front of the machine is the blade end. With the blade in front of you, push both levers forward to go forward. If the upper is swung 180 degrees so the blade is behind you, the travel controls are reversed. So check where the blade is before you move.
Travel slowly with the bucket low. Turn by moving one lever more than the other. Leave the high-speed travel setting off on slopes and rough ground.
Dig
- Set up square and level. Park on firm ground facing the work, and lower the blade for stability.
- Reach out and lower the bucket. Extend the stick, then drop the boom until the teeth touch the ground.
- Pull in and curl. Draw the stick toward you while you curl the bucket to fill it.
- Lift, swing, dump. Raise the boom, swing to the spoil pile and dump. Keep the pile back from the edge.
- Dig in layers. Take shallow bites and don't undercut the tracks.
Start with one motion at a time. As you get smoother, you'll blend two or three at once. Near the utility marks, slow down and dig carefully around them.
Mini excavator or full size
The controls and patterns are the same. The differences that change how you work:
- Blade. Many minis have a dozer blade. Lower it when you dig for stability, and use it to backfill.
- Boom swing. Many minis can offset the boom left or right to dig along a wall or fence.
- Size. A bigger machine has a bigger swing radius and bigger blind spots. Mark off more room, and use a spotter where you can't see.
Weights, fluid capacities and pin sizes for particular models are on our machine spec pages, including the Cat machine specs for the 305 CR and 308 CR minis.
Shut down
- Lower the bucket to the ground and lower the blade.
- Set the lock lever (the hydraulic lockout).
- Stop the engine.
- Climb out facing the machine with three points of contact.
A New York FACE report describes an operator who was killed when these steps were skipped. The bucket was up and the lock lever was off. It appeared he bumped the left joystick with his leg as he climbed out, and the house swung and pinned him against a tree. Lower the bucket and lock the controls every time you leave the seat.
Keep it running
For regular upkeep, see mini excavator track tension, changing excavator bucket teeth and hydraulic hose repair. If a boom or stick cylinder starts leaking at the rod, see what a hydraulic cylinder rebuild takes, from 13 real jobs on Mechy. For anything else, snap the machine and Mechy makes the steps, with safety, tools and parts for each one, or browse all guides, fault codes and size charts.
Running a loader too? See how to operate a skid steer.
Questions
What is the difference between ISO and SAE excavator controls?
They swap the boom and the stick between your hands. With ISO, the left joystick swings the house and moves the stick, and the right joystick moves the boom and the bucket. With SAE, the left joystick swings and moves the boom, and the right joystick moves the stick and the bucket. Check the pattern decal in the cab before you dig.
Why does my excavator drive backwards when I push the travel levers forward?
The upper is turned around. Travel levers work relative to the undercarriage, not the cab. With the blade in front of you, forward is forward. Swing the house 180 degrees so the blade is behind you and the travel controls are reversed. Look at where the blade is before you touch the travel levers.
Do I need to call 811 before digging with a mini excavator?
Yes. 811 is the free national call-before-you-dig service. Call or submit a request a few business days before you dig, wait for the utilities to mark their lines, then dig carefully around the marks.
How close can an excavator get to power lines?
OSHA's construction rule keeps equipment at least 10 feet from lines rated 50 kV or below, and farther from higher-voltage lines. Treat every overhead line as live unless its owner says it is de-energized and it is visibly grounded.
Can you change an excavator's control pattern?
On some machines, yes. Some excavators can switch between ISO and SAE. Your operator's manual says whether yours can and how. After any change, test each function slowly before you dig.
Sources
- Preventing Struck-by Fatalities Related to Excavator Quick Couplers, Buckets, and Attachments, NIOSH Science Bulletin (2022)
- Equipment Operator Killed when Pinned to a Tree by an Excavator, New York FACE report 06NY010 (NIOSH-funded)
- Excavator controls (ISO and SAE patterns), Wikipedia
- Kubota U25 operator's manual: travel direction with the dozer blade in front or behind (via ManualsLib)
- Five Steps to a Safe Shift (three points of contact), Caterpillar
- 29 CFR 1926.651, Specific excavation requirements, OSHA
- 29 CFR 1926.652, Requirements for protective systems, OSHA
- 29 CFR 1926.600, Equipment (power line clearance, lowered buckets), OSHA
- 29 CFR 1926.20, General safety and health provisions (qualified operators), OSHA
- 811 Before You Dig
Updated · By Mechy (Winding AI, Inc.) · How we write these pages
Got a job like this?
Snap the machine and say the job. Mechy makes the steps with tools, parts, safety and a moving drawing for each.
First guide free. No sign-up, no card.